Marine Parts Sourcing Desk

Global Marine Parts Distribution

Specialized in Baudouin, Yanmar, and Bosch Fuel Injection Systems · 7–21 days for most sourced parts

Reg: JM1039056-P | Independent Sourcing Desk
Logistics: Port Klang & Johor, Malaysia
HQ: Ipoh, Malaysia (Global Hub)

A Sourcing Desk, Not a Shelf

Cheap, not instant — that's the trade, and we make it openly.

Unitech Parts doesn't warehouse every part. That's exactly how we price 30–50% below list: when your RFQ lands, we go straight to the factories and verified distributors in our network, lock the best price, and physically verify every component in our Malaysian hub before dispatch.

What that means for your schedule

  • Quote: usually within 24 hours
  • Regional distributor stock (MY/SG network): 3–7 working days
  • Ex-factory orders (CN/TW/TR network): 2–4 weeks door-to-door
  • Custom production runs (coatings, private label, 500+ pcs): 6–9 weeks

No Minimum Order Quantity (MOQ). That stays. One nozzle or one thousand — we source it. Orders under USD 300 price better bundled into your next maintenance order, and we'll tell you so on the quote.

Engine down this afternoon? We'll say so straight: a local chandler is your fastest move today, and we'd rather tell you that than sell you a promise. Send us the rest of the list.

Planned maintenance is where the savings are. Send us your maintenance list — 30, 60, 90 days out — and we return one consolidated quote at sourcing-desk prices, on the dock before your window opens.

Sourcing Network

12 OEM Partnerships. Same Parts, 50% Less.

We source genuine parts directly from authorized distributors in Malaysia & China. Click any brand to explore our catalog.

Bosch LogoYanmar LogoBaudouin LogoSKF LogoDenso LogoWeichai LogoZexel LogoTwin Disc LogoZF Group LogoDelphi LogoMitsubishi LogoDonaldson Logo

Don't see your brand? We source from 40+ manufacturers.

Request a Custom Quote

The Unitech "Firewall" Process

We don't just ship parts; we physically inspect and re-verify every component in our Malaysian hub before global dispatch.

Tier-1 OEM Access

Direct accounts with manufacturers in Malaysia, China, Japan & South Asia. No European markups.

30-50% Cost Reduction

The Unitech QC Filter

Every part stops in Malaysia. We verify Part Numbers, dimensions, and casting quality before export.

Serial-Number Verification

Blind Logistics

We repackage into neutral crates. Documents show 'Malaysian Exporter' to protect your trade secrets.

100% Neutral Packaging
No Minimum Order Quantity (MOQ)
Guaranteed Compatibility Check
24/7 WhatsApp Engineering Support

Transit Times After Dispatch

Add sourcing lead time above — these are freight times, not availability. Blind Shipping Available + Serial-Verified QC.

SE Asia

✈️ Air
Next Day
🚢 Sea
3-5 Days

Hubs: From Port Klang & Johor

Middle East

✈️ Air
3-4 Days
🚢 Sea
12-18 Days

Hubs: Jebel Ali / Damman / Jeddah

🌍

West Africa

✈️ Air
3-5 Days
🚢 Sea
25-30 Days

Hubs: Lome / Dakar / Lagos

🚢

South America

✈️ Air
5-7 Days
🚢 Sea
35-45 Days

Hubs: Callao / Valparaiso / Santos